I applied online. The process took 1 day. I interviewed at Avail Infrastructure Solutions (Richland, MS) in Jan 2025
Interview
On site. 3 people. there was hr, engineering manager, and coordinator. It was in a long table. It was in Mississippi. It was fun. We walked through the facility. There was a skills test. The skills test was on inventor.