I applied online. The process took 3 weeks. I interviewed at Eriez Manufacturing (Erie, PA) in Jan 2024
Interview
Went to the main office location and sat with the supervisor, lead tech, HR and the supervisor and tech mainly asked the questions HR was documenting/typing. Seems like they already had a candidate in mind when talking with them.
Interview questions [1]
Question 1
What troubleshooting steps do you perform when a end user loses network connectivity.
Online on zoom with the engineering team and later in person at their floatation department in Canada. First, there was an HR interview for basic questions no technical then there was an engineering team interview with slides on MCQs
Interview questions [1]
Question 1
Weld failure identification of a tank based on pressure
I applied online. The process took 2 weeks. I interviewed at Eriez Manufacturing (Erie, PA) in Jan 2019
Interview
It was a longer than normal process compared to other places. Very friendly staff though, I felt very relaxed. I first met with the human resources person Then, after answering basic questions, the engineering manager came in and asked more specific questions pertaining to the open position.
Interview questions [1]
Question 1
They gave an actual knowledge quiz with a few different kinds of questions. There was some math along with experience questions.