I applied through other source. The process took 4 weeks. I interviewed at General RV Center (Wixom, MI) in Jul 2020
Interview
There was a pre-screen via phone interview before they scheduled an in-person interview. I waited about 10-15 minutes after arriving. I met with my potential boss and their boss in a dual-stage interview. The interview lasted over 1 hour, which I was not expecting.