I applied through a recruiter. The process took 2 days. I interviewed at Specialty Building Products (Duluth, GA) in Nov 2025
Interview
Had a video conf with the Director of IT (maybe Head of Engineering) and it went well. He called me onsite due to urgency of the position. I was supposed to meet the team at the same time attend technical interview in person.