I applied through a staffing agency. The process took 1+ week. I interviewed at Holiday Inn (Columbus, GA) in Aug 2014
Interview
I was Introduced to the Chief Engineer. It was a very casual interview. At this time the Hotel has not had a General Manager for the 6 months or longer. The interviewer Showed me around the Hotel and introduced me to several co-workers in different capacities. He explained some of the duties required at this point.
Interview questions [1]
Question 1
Can you do electrical, plumbing, air conditioning and sheet rocking repairs!